Steep site wastewater in Hawke's Bay: a new home above Taradale
A new four-bedroom home in a hillside subdivision above Taradale, Napier, had a problem most sections don't: the best land for a disposal field sloped at up to 47%, and it sat on the neighbouring lot. Hawke's Bay Regional Council needed proof it would be safe before granting consent.
WaterFlow designed a NaturalFlow system with a large, gently loaded dripline field, brought in a consulting engineer to review it, and answered every one of the council's questions. The consent went through, and independent lab tests show the system treating to a high standard.
The challenge: a disposal field on a 28 to 47% slope, on the lot next door
The house sits on a half-hectare lot in a new subdivision. The disposal field was planned for the adjoining lot, partway up a hillside that rises about 60 m over 225 m.
Across the field area, the slope runs from 28% at the gentlest end to 47% at the steepest. That matters, because on steep ground treated water can break out at the surface, run downhill, or add weight to the slope.
The design also had to handle a big house. Allowing for eight people at 200 L each, the system needed to treat up to 1,600 L a day.
When WaterFlow lodged the discharge consent application in late 2019, Hawke's Bay Regional Council came back with three questions:
-
The slope is over 50% in places by the council's measure, so a geotechnical report specific to wastewater disposal is needed.
-
Which irrigation rate will be used? The application form and design report gave different answers.
-
How will the wastewater get from the house lot to the field lot, and is there an easement for it?
Our approach: a large, lightly loaded dripline field and an independent engineering review
Dean Hoyle drew up the design in October 2019, with Gerry Hoyle reviewing it. The house is served by a NaturalFlow system near the house platform, which pumps treated water across to the field.
The key decision was to spread the water thinly. Bore holes on the field lot showed 300 to 400 mm of topsoil over sandy silty loam, a Category 3 soil with good drainage. Under the Hawke's Bay plan, that soil can take up to 4 mm a day. Dean designed the field at just 2 mm a day: half the allowed rate.
At that rate, 1,600 L a day needs a big field. The design called for 800 m² of dripline, laid in sixteen 50 m runs at 1 m spacing, pinned and buried under at least 100 mm of topsoil, with a 30% reserve area alongside and cut-off drains above it.
To answer the council properly, Gerry asked consulting engineer David Veale of Waiwaste to review the design. His report in February 2020 measured the slope across the field, confirmed the soil category, and backed the 2 mm/day rate. His conclusion: with the water spread evenly over the whole field, the risk of surface breakout or slope stability problems was low.
The tricky bit: a disposal field on a separate title
Putting the field on the lot next door solved the space problem but raised a legal one. If the two lots could be sold separately, a future owner could end up with a house whose wastewater field belongs to someone else.
The answer came in two parts. First, a legal easement was put in place for the pipeline that pumps treated water from the house lot across to the field lot, which the engineer's report confirmed for the council. Second, the stage 3 subdivision plan includes a condition that the two lots be held together on the same title. The house and its disposal field can't be split apart.
It's the kind of detail that's easy to miss on a subdivision, and it's the reason the council's third question had a clear answer.
The result: consent granted and independent lab tests to prove it works
With the engineer's report, a single confirmed irrigation rate and the easement in place, all three of the council's questions were answered and the system went in.
The proof is in the testing. In October 2022, a sample of the treated water was sent to an accredited lab. It came back with:
|
Test |
Result |
|---|---|
|
Biochemical oxygen demand (BOD₅) |
5.8 g/m³ |
|
Total suspended solids (TSS) |
9 g/m³ |
Low numbers on both mean the water reaching the hillside is well treated, which is exactly what you want on a slope.
WaterFlow has kept checking. In September 2023, Ken Hoyle sampled the system again at three points: the incoming wastewater, the pump chamber and the field.
Our team on designing for steep sites
"On a steep site, you don't push the soil to its limit. We halved the irrigation rate and made the field bigger, so the slope never has to work hard." — Dean Hoyle, WaterFlow
Project facts: steep slope wastewater system, Taradale
|
Location |
Hillside subdivision, Taradale, Napier, Hawke's Bay |
|
Property |
New 4-bedroom home on a 0.5 ha lot, field on the adjoining lot |
|
Councils |
Hawke's Bay Regional Council (discharge consent), Napier City Council |
|
System |
NaturalFlow NF11000P, pumped to the field |
|
Design flow |
1,600 L/day (8 people × 200 L) |
|
Slope |
28% to 47% across the field area |
|
Soil |
Category 3: 300–400 mm topsoil over sandy silty loam |
|
Irrigation rate |
2 mm/day, half the 4 mm/day allowed for this soil |
|
Disposal field |
800 m² subsurface PCDI dripline, 16 runs × 50 m, 30% reserve, cut-off drains |
|
Independent review |
Waiwaste consulting engineer, February 2020 |
|
Lab results (Oct 2022) |
BOD₅ 5.8 g/m³, TSS 9 g/m³ |
|
WaterFlow team |
Dean Hoyle (design), Gerry Hoyle (design review and consent), Ken Hoyle (sampling) |